| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. AMANAH ENGINEERING | 8*.6**.2**.*-*06.**0 | Rp. 2.752.200,00 | Rp. 2.752.200,00 | Rp. 2.752.200,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. AMANAH ENGINEERING | 8*.6**.2**.*-*06.**0 | Rp. 2.752.200,00 | Rp. 2.752.200,00 | Rp. 2.752.200,00 |