| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. TIARA NAD ENGINEERING | 00*1**2****02**0 | Rp. 49.733.683,20 | Rp. 49.733.683,20 | Rp. 49.733.683,20 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. TIARA NAD ENGINEERING | 00*1**2****02**0 | Rp. 49.733.683,20 | Rp. 49.733.683,20 | Rp. 49.733.683,20 |