| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | Cv. Tsamara Engineering | 09*6**8****02**0 | Rp. 99.713.187,00 | Rp. 99.713.187,00 | Rp. 99.703.937,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | Cv. Tsamara Engineering | 09*6**8****02**0 | Rp. 99.713.187,00 | Rp. 99.713.187,00 | Rp. 99.703.937,00 |