| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. MIFTAH ENGINEERING CONSULTANT | 7*.9**.5**.*-*02.**0 | Rp. 9.024.078,00 | Rp. 9.024.078,00 | Rp. 8.907.528,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. MIFTAH ENGINEERING CONSULTANT | 7*.9**.5**.*-*02.**0 | Rp. 9.024.078,00 | Rp. 9.024.078,00 | Rp. 8.907.528,00 |