| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | ARGA CIPTA ENGINEERING | 8*.5**.8**.*-*05.**0 | Rp. 129.221.956,58 | Rp. 129.221.956,58 | Rp. 128.792.956,59 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | ARGA CIPTA ENGINEERING | 8*.5**.8**.*-*05.**0 | Rp. 129.221.956,58 | Rp. 129.221.956,58 | Rp. 128.792.956,59 |