| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT. BADAI SEROJA ENGINEERING | 4*.1**.2**.*-*22.**0 | Rp. 149.597.290,02 | Rp. 149.597.290,02 | Rp. 149.350.817,46 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT. BADAI SEROJA ENGINEERING | 4*.1**.2**.*-*22.**0 | Rp. 149.597.290,02 | Rp. 149.597.290,02 | Rp. 149.350.817,46 |