| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT. BERDIKARI KARYATAMA ENGINEERING | 5*.9**.8**.*-*04.**0 | Rp. 183.330.042,00 | Rp. 183.330.042,00 | Rp. 183.330.042,00 | |
| 2 | Tejo Narayana | 0*.0**.9**.*-*08.**0 | Rp. 184.256.892,00 | Rp. 184.256.892,00 | Rp. 184.256.892,00 |