| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV SANGGAM PREMATURE CONSTRUCTIONS | 10*0**0****39**3 | Rp. 171.703.741,93 | Rp. 171.703.741,93 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV SANGGAM PREMATURE CONSTRUCTIONS | 10*0**0****39**3 | Rp. 171.703.741,93 | Rp. 171.703.741,93 |