| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CIPTA BUILD ENGINEERING | 10*1**1****05**7 | Rp. 69.964.687,50 | Rp. 69.964.687,50 | Rp. 69.888.375,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CIPTA BUILD ENGINEERING | 10*1**1****05**7 | Rp. 69.964.687,50 | Rp. 69.964.687,50 | Rp. 69.888.375,00 |