| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CIPTA BUILD ENGINEERING | 10*1**1****05**7 | Rp. 99.922.644,00 | Rp. 99.922.644,00 | Rp. 99.922.644,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CIPTA BUILD ENGINEERING | 10*1**1****05**7 | Rp. 99.922.644,00 | Rp. 99.922.644,00 | Rp. 99.922.644,00 |