| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | cv. ashgaf engineering | 09*3**1****21**0 | Rp. 86.040.336,00 | Rp. 86.040.336,00 | Rp. 85.940.336,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | cv. ashgaf engineering | 09*3**1****21**0 | Rp. 86.040.336,00 | Rp. 86.040.336,00 | Rp. 85.940.336,00 |