| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. USAHA SINERGI ENGINEERING | 10*0**0****11**6 | Rp. 95.793.000,00 | Rp. 95.793.000,00 | Rp. 95.260.200,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. USAHA SINERGI ENGINEERING | 10*0**0****11**6 | Rp. 95.793.000,00 | Rp. 95.793.000,00 | Rp. 95.260.200,00 |