| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. PROTEC CONSTRUCTION | 4*.7**.1**.*-*31.**0 | Rp. 199.943.590,32 | Rp. 199.943.590,32 | Rp. 199.838.140,32 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. PROTEC CONSTRUCTION | 4*.7**.1**.*-*31.**0 | Rp. 199.943.590,32 | Rp. 199.943.590,32 | Rp. 199.838.140,32 |