| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. PROTEC CONSTRUCTION | 4*.7**.1**.*-*31.**0 | Rp. 198.829.627,06 | Rp. 198.829.627,06 | Rp. 198.696.427,06 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. PROTEC CONSTRUCTION | 4*.7**.1**.*-*31.**0 | Rp. 198.829.627,06 | Rp. 198.829.627,06 | Rp. 198.696.427,06 |