| No | Nama Peserta | NPWP | A | K | T | Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | P | PK | Alasan |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | CV.ZURA GRUP KONSTRUKSI | 06*1**6****53**0 | Rp. 378.781.761,30 | Rp. 378.781.761,30 | Rp. 378.000.321,30 | ![]() |
![]() |
|||||
| 2 | CV. TIGA BENIH BIG | 03*5**6****51**0 | ||||||||||
| 3 | CV. WIRAKARYA SANDU PERKASA | 00*7**8****51**0 |
- A Evaluasi Administrasi
- K Evaluasi Kualifikasi
- T Evaluasi Teknis
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak
