| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT. KREASI TEKNIKTAMA KONSULTAN | 4*.3**.1**.*-*01.**0 | Rp. 59.412.750,00 | Rp. 59.412.750,00 | Rp. 59.112.750,00 | |
| 2 | MITRA DESIGN ENGINEERING | 0*.1**.7**.*-*19.**0 | Rp. 59.745.750,00 | Rp. 59.745.750,00 | ||
| 3 | PT. CIPTA SARANA MITRA ENGINEERING | 0*.9**.2**.*-*19.**0 | Rp. 59.884.500,00 | Rp. 59.884.500,00 |