| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ARITAMA ENGINEERING | 10*1**1****45**8 | Rp. 99.789.000,00 | Rp. 99.789.000,00 | Rp. 99.456.000,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ARITAMA ENGINEERING | 10*1**1****45**8 | Rp. 99.789.000,00 | Rp. 99.789.000,00 | Rp. 99.456.000,00 |