| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT BATAM STRUCTURAL ENGINEERS | 00*7**8****15**0 | Rp. 36.041.100,00 | Rp. 36.041.100,00 | Rp. 35.821.100,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT BATAM STRUCTURAL ENGINEERS | 00*7**8****15**0 | Rp. 36.041.100,00 | Rp. 36.041.100,00 | Rp. 35.821.100,00 |