| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV AITO ENGINEERING | 09*5**3****25**0 | Rp. 46.409.100,00 | Rp. 46.409.100,00 | Rp. 46.342.500,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV AITO ENGINEERING | 09*5**3****25**0 | Rp. 46.409.100,00 | Rp. 46.409.100,00 | Rp. 46.342.500,00 |