| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV AITO ENGINEERING | 09*5**3****25**0 | Rp. 50.930.962,50 | Rp. 50.930.962,50 | Rp. 50.930.962,50 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV AITO ENGINEERING | 09*5**3****25**0 | Rp. 50.930.962,50 | Rp. 50.930.962,50 | Rp. 50.930.962,50 |