| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT Indonesian Construction And Machinery | 01*6**1****12**0 | Rp. 148.678.614,00 | Rp. 148.678.614,00 | Rp. 148.000.000,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT Indonesian Construction And Machinery | 01*6**1****12**0 | Rp. 148.678.614,00 | Rp. 148.678.614,00 | Rp. 148.000.000,00 |