| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | TRIMETRI KARYA KONSULTAN | 06*0**8****14**0 | Rp. 11.139.197,80 | Rp. 11.139.197,65 | Rp. 10.837.300,00 | |
| 2 | CV. ZETTA ENGINEERING CONSULTANT | 10*0**0****05**4 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | TRIMETRI KARYA KONSULTAN | 06*0**8****14**0 | Rp. 11.139.197,80 | Rp. 11.139.197,65 | Rp. 10.837.300,00 | |
| 2 | CV. ZETTA ENGINEERING CONSULTANT | 10*0**0****05**4 |