| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ZN ENGINEERING | 9*.8**.0**.*-*03.**0 | Rp. 36.578.500,00 | Rp. 36.578.500,00 | Rp. 36.158.500,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ZN ENGINEERING | 9*.8**.0**.*-*03.**0 | Rp. 36.578.500,00 | Rp. 36.578.500,00 | Rp. 36.158.500,00 |