| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | RATU SAMBIAYU KONSTRUKSI | 10*0**0****19**5 | Rp. 190.330.044,88 | Rp. 190.330.044,88 | Rp. 189.564.144,88 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | RATU SAMBIAYU KONSTRUKSI | 10*0**0****19**5 | Rp. 190.330.044,88 | Rp. 190.330.044,88 | Rp. 189.564.144,88 |