| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | Semesta Engineering | 10*1**1****75**7 | Rp. 47.758.194,00 | Rp. 47.758.194,00 | Rp. 47.480.694,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | Semesta Engineering | 10*1**1****75**7 | Rp. 47.758.194,00 | Rp. 47.758.194,00 | Rp. 47.480.694,00 |