| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV Seiko Engineering | 09*2**3****01**0 | Rp. 34.885.385,25 | Rp. 34.885.385,25 | Rp. 34.885.385,25 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV Seiko Engineering | 09*2**3****01**0 | Rp. 34.885.385,25 | Rp. 34.885.385,25 | Rp. 34.885.385,25 |