| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | YAMAN ENGINEERING | 08*3**2****01**0 | Rp. 29.895.807,60 | Rp. 29.895.807,60 | Rp. 29.784.807,60 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | YAMAN ENGINEERING | 08*3**2****01**0 | Rp. 29.895.807,60 | Rp. 29.895.807,60 | Rp. 29.784.807,60 |