| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | FM ENGINEERING | 09*7**8****08**0 | Rp. 196.466.700,01 | Rp. 196.466.700,00 | Rp. 195.911.700,01 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | FM ENGINEERING | 09*7**8****08**0 | Rp. 196.466.700,01 | Rp. 196.466.700,00 | Rp. 195.911.700,01 |