| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. MARZAN ENGINEERING | 4*.2**.2**.*-*11.**0 | Rp. 64.944.435,00 | Rp. 64.944.435,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. MARZAN ENGINEERING | 4*.2**.2**.*-*11.**0 | Rp. 64.944.435,00 | Rp. 64.944.435,00 |