| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | YDL Engineering | 6*.5**.5**.*-*12.**0 | Rp. 57.403.190,21 | Rp. 57.403.000,00 | Rp. 57.403.190,21 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | YDL Engineering | 6*.5**.5**.*-*12.**0 | Rp. 57.403.190,21 | Rp. 57.403.000,00 | Rp. 57.403.190,21 |