| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV ADYATAMA ENGINEERING | 09*1**1****12**0 | Rp. 56.253.690,00 | Rp. 56.253.690,00 | Rp. 56.253.690,00 | |
| 2 | FHM ENGINEERING | 08*5**7****17**0 | ||||
| 3 | CV MAHAWIRYA LAKSITA | 04*7**0****02**0 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV ADYATAMA ENGINEERING | 09*1**1****12**0 | Rp. 56.253.690,00 | Rp. 56.253.690,00 | Rp. 56.253.690,00 | |
| 2 | FHM ENGINEERING | 08*5**7****17**0 | ||||
| 3 | CV MAHAWIRYA LAKSITA | 04*7**0****02**0 |