| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ARCHINDO ENGINEERING | 10*0**0****66**2 | Rp. 55.804.456,35 | Rp. 55.804.456,35 | Rp. 55.804.456,35 | |
| 2 | VERYANTO | 35*6**2****70**3 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ARCHINDO ENGINEERING | 10*0**0****66**2 | Rp. 55.804.456,35 | Rp. 55.804.456,35 | Rp. 55.804.456,35 | |
| 2 | VERYANTO | 35*6**2****70**3 |