| No | Nama Peserta | NPWP | A | K | T | Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | P | PK | Alasan |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | TRIPLE H CONSTRUCTION | 9*.7**.5**.*-*43.**0 | Rp. 167.466.548,00 | Rp. 167.466.548,00 | Rp. 164.753.000,00 | ![]() |
![]() |
|||||
| 2 | Alshan Putra Mandiri | 5*.5**.9**.*-*25.**0 | Rp. 167.545.804,00 | Rp. 167.545.804,00 | ||||||||
| 3 | SANUFI BERKAH | 9*.0**.9**.*-*43.**0 |
- A Evaluasi Administrasi
- K Evaluasi Kualifikasi
- T Evaluasi Teknis
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak
