| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT. ARMONT HODIY SITUMEANG | 8*.3**.2**.*-*29.**0 | Rp. 178.299.254,25 | Rp. 178.299.254,25 | Rp. 177.318.000,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT. ARMONT HODIY SITUMEANG | 8*.3**.2**.*-*29.**0 | Rp. 178.299.254,25 | Rp. 178.299.254,25 | Rp. 177.318.000,00 |