| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT HEAVEN INFRA STRUKTUR | 02*3**6****57**0 | Rp. 199.341.250,67 | Rp. 199.341.250,67 | Rp. 199.141.450,67 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT HEAVEN INFRA STRUKTUR | 02*3**6****57**0 | Rp. 199.341.250,67 | Rp. 199.341.250,67 | Rp. 199.141.450,67 |