| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV Almass Engineering | 10*0**0****83**2 | Rp. 90.845.632,32 | Rp. 90.845.632,00 | Rp. 90.457.132,32 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV Almass Engineering | 10*0**0****83**2 | Rp. 90.845.632,32 | Rp. 90.845.632,00 | Rp. 90.457.132,32 |