| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SR ARTO ENGINEERING | 09*3**6****35**0 | Rp. 49.798.324,05 | Rp. 49.798.324,05 | Rp. 49.582.984,05 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SR ARTO ENGINEERING | 09*3**6****35**0 | Rp. 49.798.324,05 | Rp. 49.798.324,05 | Rp. 49.582.984,05 |