| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT. BUMI TENVIRO ENGINEERING | 06*9**4****32**0 | Rp. 99.622.500,00 | Rp. 99.622.500,00 | Rp. 99.123.000,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | PT. BUMI TENVIRO ENGINEERING | 06*9**4****32**0 | Rp. 99.622.500,00 | Rp. 99.622.500,00 | Rp. 99.123.000,00 |