| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV.Borneo Engineering Consultant | 07*1**1****23**0 | Rp. 99.911.544,00 | Rp. 99.911.544,00 | Rp. 99.911.544,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV.Borneo Engineering Consultant | 07*1**1****23**0 | Rp. 99.911.544,00 | Rp. 99.911.544,00 | Rp. 99.911.544,00 |