| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | FUAD HARWADI ENGINEERING | 2*.0**.1**.*-*27.**0 | Rp. 98.755.728,75 | Rp. 98.755.728,75 | Rp. 98.755.728,75 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | FUAD HARWADI ENGINEERING | 2*.0**.1**.*-*27.**0 | Rp. 98.755.728,75 | Rp. 98.755.728,75 | Rp. 98.755.728,75 |