| No | Nama Peserta | NPWP | A | K | T | Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | P | PK | Alasan |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | CV. Karmantel Engineer | 09*0**7****41**0 | Rp. 74.314.500,00 | Rp. 74.314.500,00 | ||||||||
| 2 | CV. Carabiner Engineering Consultan | 00*5**7****22**0 | Rp. 74.636.400,00 | Rp. 74.636.400,00 | Rp. 74.636.400,00 | ![]() |
||||||
| 3 | CV ALPHA CONSULINDO | 10*0**0****06**4 | Rp. 75.147.000,00 | Rp. 75.147.000,00 | Dokumen Teknis tidak lengkap |
- A Evaluasi Administrasi
- K Evaluasi Kualifikasi
- T Evaluasi Teknis
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak
