| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | AZZAHRA ENGINEERING | 8*.9**.5**.*-*23.**0 | Rp. 195.914.010,42 | Rp. 195.914.010,42 | Rp. 195.914.010,42 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | AZZAHRA ENGINEERING | 8*.9**.5**.*-*23.**0 | Rp. 195.914.010,42 | Rp. 195.914.010,42 | Rp. 195.914.010,42 |