| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. MUSTIKA | 3*.1**.8**.*-*55.**0 | Rp. 97.526.904,56 | Rp. 97.520.000,00 | Rp. 97.200.564,56 | |
| 2 | Multindo Engineering | 7*.9**.4**.*-*55.**0 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. MUSTIKA | 3*.1**.8**.*-*55.**0 | Rp. 97.526.904,56 | Rp. 97.520.000,00 | Rp. 97.200.564,56 | |
| 2 | Multindo Engineering | 7*.9**.4**.*-*55.**0 |