| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ARKATAMA RAYA ENGINEERING | 06*5**6****11**0 | Rp. 16.317.000,00 | Rp. 16.317.000,00 | Rp. 15.984.000,00 | |
| 2 | CV. ALNAGARA CONSULTING ENGINEERS | 10*1**1****33**8 | Rp. 16.317.000,00 | Rp. 16.317.000,00 |