| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SOE DARMA ENGINEERING | 10*1**1****20**8 | Rp. 40.326.300,00 | Rp. 40.326.300,00 | Rp. 40.326.300,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. SOE DARMA ENGINEERING | 10*1**1****20**8 | Rp. 40.326.300,00 | Rp. 40.326.300,00 | Rp. 40.326.300,00 |