| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ALPHA TERRA ENGINEERING | 10*0**0****04**8 | Rp. 99.844.500,00 | Rp. 99.844.500,00 | Rp. 99.844.500,00 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | CV. ALPHA TERRA ENGINEERING | 10*0**0****04**8 | Rp. 99.844.500,00 | Rp. 99.844.500,00 | Rp. 99.844.500,00 |