| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | LIMASATU KONSTRUKSI | 03*5**5****24**0 | Rp. 94.022.911,80 | Rp. 94.022.911,80 | Rp. 93.908.915,91 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | LIMASATU KONSTRUKSI | 03*5**5****24**0 | Rp. 94.022.911,80 | Rp. 94.022.911,80 | Rp. 93.908.915,91 |