| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | LIMASATU KONSTRUKSI | 03*5**5****24**0 | Rp. 103.351.652,94 | Rp. 103.351.652,94 | Rp. 103.018.652,94 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | LIMASATU KONSTRUKSI | 03*5**5****24**0 | Rp. 103.351.652,94 | Rp. 103.351.652,94 | Rp. 103.018.652,94 |