| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | LIMASATU KONSTRUKSI | 03*5**5****24**0 | Rp. 195.692.223,33 | Rp. 195.692.223,33 | Rp. 195.359.223,33 |
| No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
|---|---|---|---|---|---|---|
| 1 | LIMASATU KONSTRUKSI | 03*5**5****24**0 | Rp. 195.692.223,33 | Rp. 195.692.223,33 | Rp. 195.359.223,33 |