| No | Nama Peserta | NPWP | A | K | T | Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | P | PK | Alasan |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | CV SIKA KONSTRUKSI INDONESIA | 3*.4**.7**.*-*42.**0 | Rp. 199.231.821,72 | Rp. 199.231.821,72 | Rp. 199.231.821,72 | ![]() |
![]() |
|||||
| 2 | CV. AZKA JAYA | 7*.6**.6**.*-*19.**0 | Rp. 199.626.347,32 | Rp. 199.626.347,32 | Rp. 199.626.347,32 | |||||||
| 3 | CV. LOKA JAYA | 3*.4**.1**.*-*19.**0 | Rp. 199.781.747,32 | Rp. 199.781.747,32 | Rp. 199.781.747,32 |
- A Evaluasi Administrasi
- K Evaluasi Kualifikasi
- T Evaluasi Teknis
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak
